How a commission works

From first conversation
to the keys in your hand.

Every Ertex project runs the same way, whether the vehicle is already yours or we source it for you. Here is what happens, in what order, and what we need from you at each point.

Starting point

Three ways a project begins

Where you enter the process changes the first step, not the standard of what follows.

Option A

You already have the vehicle

Send us the vehicle and we design around its exact specification. The feasibility review comes first, so you know what the chassis allows before any commitment.

Option B

Choose from stock

Take one of the vehicles already in build or in the showroom and have it tailored to your requirements — the fastest route to delivery.

Option C

We source it for you

We procure the base vehicle from Mercedes-Benz on your behalf, in the specification the project needs, and it comes to us directly.

Stage one

Design, decided together

We work through how the vehicle will be used before we discuss what goes in it: who travels, how far, what has to stay private, what has to be reachable. From that we present a design direction rather than a menu.

Seating, materials, lighting, technology and every practical detail are then settled with you, and the vehicle is measured and modelled so that what is agreed is what can actually be built. You approve the design before anything is cut.

Measured
3D scanning of your specific vehicle, not a generic model
Approved
Production begins only after you sign off the design

Stage two

Production at the Ankara facility

The vehicle enters the workshop and around eighty percent of the interior is produced in-house — machined from approved data, upholstered by hand, and assembled by the teams that made the parts.

Electronics are tested before they go into the cabin, structural components follow their technical drawings, and quality records are kept as the build progresses rather than reconstructed at the end.

Ertex production workshop
Ertex showroom interior where finished vehicles are handed over

Stage three

Homologation, then delivery

The completed vehicle goes through the homologation testing applicable to its conversion, so it can be registered and used legally in its destination market. Most projects are delivered within fifteen to forty-five days, depending on specification.

Collection can be from any of our showrooms, or the vehicle can be delivered to you — we handle international delivery as a matter of routine.

Where to meet us

Four showrooms, one standard

Configuration is easier in person, with the materials in your hands and a finished vehicle to sit in.

LocationRole
AnkaraHeadquarters, production and delivery centre
IstanbulNisbetiye, Etiler — private viewing lounge and test drives
DüsseldorfGermany and wider European market, opened 2021
DubaiSheikh Zayed Road — UAE and GCC, opened 2024

Showrooms

Ankara, Istanbul, Düsseldorf, Dubai

Enquire

Start with how you will use it

Tell us about the journeys and the passengers. We will come back with a design direction, a realistic timeline and a clear view of what the platform allows.